![]() ![]() If a problem is encountered affecting one or more of the nodes during the upgrade process, the entire cluster is rolled back to the original, working version. A system notification is sent when the upgrade finishes successfully. Low-level details are written to the file /storage/core/loginsight/var/upgrade.log on each individual node. If the integrated load balancer is configured, its IPs are migrated among the cluster nodes so cluster services, including UI, API, and ingestion of incoming events, remain available throughout the rolling upgrade. You can see the status of the rolling upgrade on the Management > Cluster page. ![]() Each of the cluster nodes is upgraded sequentially. Upgrading using the Integrated Load Balancer IP address is not supported.ĭuring upgrade, the primary node is upgraded first, and restarts. Upgrading vRealize Log Insight must be done from the primary node's FQDN.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |